10-5 is CB code for "Pass it on!"
Increasing the daily tonnage limits for the utilization center by 50% is far more than needed for the construction projects at UVA. It allow RSWA to accept waste from other localities?
Increasing the daily tonnage limits for the utilization center by 50% is far more than needed for the construction projects at UVA. It allow RSWA to accept waste from other localities?