2 Comments
author

This edition was corrected minutes after publication to fix an incorrect headline, and updated status for Charlottesville City Hall (it's closed).

Expand full comment

The City's 5th ST SW (Highway) was an issue in the 1998 Ridge Street Study which should be available in the Department Neighborhood Development Services. It was recommended that the corridor be redesigned on a neighborhood scale with a 25 mph speed limit in order to offset the original intended design of being a four-lane highway connecting I-64 to the Meadowcreek Parkway on to 29N. This design should be done in conjunction with VDOT since the road is actually SR 631. It is too large of a project to be handled by the City's lone traffic engineer.

Expand full comment